485.000 €
3.849 €/m²
3 Zimmer
Grundfläsche 147 m²
3-bedroom apartment on the 2nd floor (top floor) of the ’Cerro das Mós’ development in Lagos. With 126.05 m² of gross living area and 20.55 m² of balconies spread across three outdoor spaces, this unit offers generous space for families, with three well-distributed bedrooms and the advantage of being on the top floor greater privacy, less street noise, and closer proximity to the rooftop pool. Interior layout: Three bedrooms (15.0 m², 15.3 m² and 15.7 m²), two bathrooms one en-suite (5.7 m²) and one guest bathroom (6.2 m²) , a 28.4 m² living/dining room and a 10.9 m² fitted kitchen, open-plan with direct access to the terrace. Quality finishes throughout: Fully fitted kitchen with Bosch appliances (induction hob, oven, microwave, dishwasher and fridge) and an Electrolux extractor hood, Silestone/Compac worktop. Bathrooms with Grohe taps and sanitaryware, rectified porcelain tiling up to ceiling height. Bedrooms with built-in wardrobes with drawer modules, white lacquered interior doors, and an armored front door with a high-security lock. Air conditioning in the living room and bedrooms, electric blinds with thermal insulation, a color video intercom and fibre-optic connectivity. Reinforced thermal and acoustic insulation, with domestic hot water from solar panels. Development advantages: This unit is part of ’Cerro das Mós’, a development with a rooftop swimming pool and a fully equipped gym of over 120 m². As the highest unit, it also offers the closest access to the rooftop pool. A private garage box is included (Box 7), accessed via a lift with capacity for 8 people. Location: Peaceful residential area of São Gonçalo de Lagos, with easy access to public transport, a pharmacy, a school, a hypermarket and direct motorway access. A short drive away are Porto de Mós Beach and Luz Beach, as well as Lagos Marina and the historic city center. Payment terms: 20% upon signing the Promissory Contract · 20% upon completion of the structure · 60% at the deed. Completion expected: end of 2027 (within the legal term of the construction license, valid until 2028). #ref:KT_1795_J
Letzte etage
Mit aufzug
Mit garage